Bentley Motors, Crewe Factory
A SHALLOW RAMP GRADIENT TO THE NEW INDUCTION BUILDING
Modular Building
Crewe, Cheshire
REQUIREMENT:
A ramp to achieve a 1:20 gradient to the new induction facility at the car factory.
As the name suggests, new trainees will start with a formal induction in this building, before beginning their respective programmes.
ADDITIONAL INFORMATION:
END RESULT:
A Rapid Ramp was installed and ready to use within a day.
FEATURES INCLUDED:
- Trombone Ends - Installed at the ends of a Rapid Ramp to prevent clothes from snagging.
- Mesh Platform -Self-draining mesh allows water to pass through, preventing surface accumulation.
- Standard Black Colour - Our ramps feature a powder-coated black finish, ensuring durability beyond typical paint.
- Standard Handrail - Designed for hand gripping, providing stability and support.
- Adjustable Telescopic Legs - Can be adapted to suit various threshold heights.
EXTRA FEATURE INCLUDED:
- 1100 High Handrail - these handrails attach to any level sections.