Abingdon and Witney College

MODULAR ACCESS TO THE DANCE STUDIO

Application
Education
Location
Witney, Oxfordshire
System
Fully Compliant Ramp System
Service Package
Supply & Install

REQUIREMENT:

A modular building scheduled to be assembled during the summer holiday had to be accessible for students, staff, and visitors of all abilities.

 The chosen ramp system had to comply with the Disability Discrimination Act and Part M of the Building Regulations.

CAD DRAWINGS:

These were produced internally, utilising the architectural drawings supplied by the client.

END RESULT:

After the construction of the building was completed, we implemented a fully compliant Rapid Ramp, including a step unit at the front entrance.

Our proficient team successfully completed the installation within a few days of the summer holiday.

FEATURES INCLUDED:

  •  Infill Handrail - This product safeguards against users climbing or falling through gaps.
  • Yellow Tread - A safety feature designed to help those with impaired vision identify the system's nose and any level changes.
  • Trombone Ends - Installed at the ends of a Rapid Ramp to prevent clothes from snagging.
  • Mesh Platform - Self-draining mesh allows water to pass through, preventing surface accumulation.
  • Continuous Handrail - This handrail system ensures that users always have a support to hold onto.
  • 1100mm High Rail - these handrails attach to any level sections.
  • Standard Colour: Black - Our ramps boast a powder-coated black finish, ensuring durability beyond typical paint.
  • Adjustable Telescopic Legs - These can be adapted to suit various threshold heights.

EXTRA FEATURE INCLUDED:

  • Fully Compliant Step Unit - The perfect companion to any ramp setup, delivering the necessary access for able-bodied users. They can also function as standalone units, operating independently of the Rapid Ramp System.

FLEXIBLE INSTALLATIONS:

Installations are flexible and planned around the specific needs of each school.

Often installers will work during the holidays to accommodate around the teaching timetable.

Alternatively, installations during term time hours are just as achievable, and our team are fully DBS checked (formerly CRB), which covers working with children and vulnerable adults.

Gallery

GET A QUICK PRICE

The more information you can provide, the quicker we can quote.

Your Details

Project Details

Additional Information

Please email all attachments to [email protected]
Remember to include the site address within the subject line for reference.

Rapid Ramps is committed to handling information you have supplied to us in compliance with the Data Protection Act. We'll never share your details and you can unsubscribe at any time. Please visit our Privacy Policy for more information.

THE UK’S EXPERTS IN MODULAR RAMP SYSTEMS.

Rapid Ramp

Riverside Works, Church Ln, Etchingham, TN19 7AS

Hours:
8am - 5pm, Monday to Friday