Construction Site, Kent

Application
Modular Building
Location
Construction Site, Kent
System
Standard Step System
Service Package
Rapid Rental

REQUIREMENT:

Temporary step units  and ramps to the welfare cabin.

Once the construction works are completed, the building and systems will be dismantled.

Each step unit can be flat packed and strapped down within the cabin ready for the next site.

ADDITIONAL INFORMATION:

 CAD drawing were designed by our specialist designer in-house. 

END RESULT:

Installation was completed within three days.

Step Unit D has a low threshold height; therefore, a platform was unnecessary. However, all other units include one.

Ramp E includes a joining platform with a width of 2.7 m, providing appropriate turning space for wheelchairs and trolleys, and both ramps have a compliant 1:15 gradient.

FEATURES INCLUDED:

  • Trombone Ends - these are added to the ends to prevent clothes catching.
  • Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.
  • Standard Handrail - this handrail system ensures users always have support to hold onto.
  • Standard Colour Black – Systems are powder coated black to create a durable finish that is tougher than conventional paint.
  • Telescopic Legs - legs can be adjusted to accommodate different threshold heights.

EXTRA FEATURES INCLUDED:

  • Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp. Additionally, it helps users distinguish any level changes.
  • Infill Handrail - included on step unit linked with Ramp E. The product prevents users from climbing or falling through gaps.

Gallery

GET A QUICK PRICE

The more information you can provide, the quicker we can quote.

Your Details

Project Details

Additional Information

Please email all attachments to [email protected]
Remember to include the site address within the subject line for reference.

Rapid Ramps is committed to handling information you have supplied to us in compliance with the Data Protection Act. We'll never share your details and you can unsubscribe at any time. Please visit our Privacy Policy for more information.

THE UK’S EXPERTS IN MODULAR RAMP SYSTEMS.

Rapid Ramp

Riverside Works, Church Ln, Etchingham, TN19 7AS

Hours:
8am - 5pm, Monday to Friday