Published on Wednesday 16th December 2020
Post-Brexit preparations are underway with Inland border facilities and lorry parks being produced to accommodate expected road congestions.
Post-Brexit preparations are underway with Inland border facilities and lorry parks being produced to accommodate expected road congestions.
Site locations include:
These post-Brexit sites will deliver customs and document checks on cross-channel lorries from 1 January 2021.
Temporary on-site office buildings and welfare cabins will also be available for staff and driver use.
Rapid Ramp can support the post-brexit preparations, with modular ramps and steps that provide easy access into buildings and cabins.
Plus, we are not dependent on the ports as all our products are manufactured in Britain.
Like temporary buildings, our modular ramps & steps are prefabricated systems that carry benefits, including:
We offer three varied service packages to suit different access needs:
We are not permitted to share any images taken from completed installations carried out within the HMRC sites, including images of our ramps. However, you can find similar installations below or via our case study filter page.
Hainault Homeless Centre, London
COVID-19 Testing Site, Accrington
Request a quick quote or email [email protected] with the full project address, drawings, photos and contact details.
Sources:
https://inlandborderfacilities.uk/
https://www.gov.uk/government/publications/attending-an-inland-border-facility
THE UK’S EXPERTS IN MODULAR RAMP SYSTEMS.
Rapid Ramp
Riverside Works, Church Ln, Etchingham, TN19 7AS
Hours:
8am - 5pm, Monday to Friday