Health & Safety at Rapid Ramp

Health & Safety at Rapid Ramp

Published on Wednesday 15th June 2022

The health and safety of our workforce continues to be a priority, with safe working practices expected to be observed and followed by all staff members during working hours, e.g., when undertaking site surveys and installations.

The health and safety of our workforce continues to be a priority, with safe working practices expected to be observed and followed by all staff members during working hours, e.g., when undertaking site surveys and installations.

We are happy to report that between the dates 2017-2022, we only had one recorded accident.  

 

Examples of safe working practices and assessments observed and implemented at Rapid Ramp include (but are not limited to):

 

  • Control measures are observed in the office, warehouse and on-site during installations and on-site surveys. 
  • Covid risk assessments for installations and site surveys.
  • Workplace risk and COSHH assessments.
  • Fitters operating in schools are fully DBS (formerly CRB) checked and hold CSC Labour Cards.
  • Health & safety accreditation provided by Constructionline.
  • Fire risk assessments and staff have undergone fire safety training.
  • An annual plan is undertaken to ensure health and safety standards are adequately maintained. 
  • Fitters are provided and wear appropriate personal protective equipment (PPE) whilst on-site for installations and site surveys.

Free Quick Quote For A Ramp or Steps 

Request a quick quote or email [email protected] with the full project address, drawings, photos and contact details.

 


CASE STUDIES

Carlisle Park Pavilion Cafe

A HEAVY-DUTY RAMP TO THE PARK PAVILION

Application : Public Building
Location : Morpeth, Northumberland
System : Standard Ramp System

Supply & Install

Euston Station

FAST, TEMPORARY ACCESS FOR THE STATION

Application : Public Building
Location : London
System : Fully Compliant Ramp & Step System

Rapid Rental

Hathersage Road Car Park, Manchester Royal Infirmary

Application : Public Building
Location : Manchester
System : Standard Ramp System

Supply & Install

Heigham Water Treatment Works

Application : Modular Building
Location : Norwich, Norfolk
System : Standard Ramp System

Supply & Install

Holy Cross Preparatory School

ACCESS TO THE SCHOOL PLAYGROUND

Application : Education
Location : Kingston upon Thames, Greater London
System : Fully Compliant Ramp System

Supply & Install

Woking, Surrey

Application : Residential
Location : Woking, Surrey
System : Standard Ramp System

Supply & Install

THE UK’S EXPERTS IN MODULAR RAMP SYSTEMS.

Rapid Ramp

Riverside Works, Church Ln, Etchingham, TN19 7AS

Hours:
8am - 5pm, Monday to Friday